One link to the
current site status
3D model with timestamp. From this, we automatically create weekly reports and open items with photos as evidence.
One walkthrough per week is enough.

What you get every week
Weekly report as PDF
Automatically generated and ready to send. Documentation of construction progress without manual effort.
List of open items
Including photos and precise location in the model. Every defect is clearly documented.
Comparison with previous week
Visual evidence of what has changed. Transparency for owners and project management.
When everyone has a different view of the site status, errors, delays, and disputes arise.
14.1 hrs
wasted per week
Searching for info, conflict resolution
5%
Typical rework share
Direct costs due to errors
€37.9M
Avg. dispute value
Taking 14.2 months to resolve
Sources: FMI Corp, PlanGrid, Navigant Construction Forum
How the weekly report is created
1. Walkthrough
Easily with a smartphone or a 360° camera. No training necessary.
2. 3D Model
We create a photorealistic 3D model with a timestamp. Walkable in the browser.
3. Results
You automatically receive the weekly report and the list of open items.
One link for the whole team
3D model in the browser
Runs on any laptop. No installation. Access for owners, general contractors, and subcontractors.
Time comparison & evidence
Jump back week by week. Prove the construction status at any point in time.
Automatic reports
Progress, open items, and deviations are recognized and listed by the AI.
Time comparison & evidence
Drag the slider to compare two construction phases of the same area.


Test run (4 weeks)
- 1 construction site in Munich or surroundings
- 1 walkthrough per week
- Every week: report + open items
Effort for you: one contact person, 10 minutes per week.
Weekly Construction Progress Report (Example)
This is what the result looks like that you and your partners receive automatically every week.
Open full screen A4 reportProject: Residence by the Park
Reporting period: CW 07 (09.02.2026 - 15.02.2026)

Weather
12°C, Sunny
Personnel
12 workers on site
Progress this week
- Screed work on the ground floor 100% completed
- Installation of interior doors (south wing) started
- Electrical fine installation (2nd floor) completed
Open items

Scratch on the window frame
AI find: Damage to the powder coating on the frame profile.

Missing sealant
Sanitary area (north wall): Sealing collar in the shower area is missing.
Data and Security
Access Control
Invite-only access
Your Property
Data remains yours, deletion at any time
EU Hosting
Storage in the EU upon request
Confidential
NDA possible at any time