One link to the
current site status

3D model with timestamp. From this, we automatically create weekly reports and open items with photos as evidence.

One walkthrough per week is enough.

Rayfield Capture Equipment
Results

What you get every week

Weekly report as PDF

Automatically generated and ready to send. Documentation of construction progress without manual effort.

List of open items

Including photos and precise location in the model. Every defect is clearly documented.

Comparison with previous week

Visual evidence of what has changed. Transparency for owners and project management.

When everyone has a different view of the site status, errors, delays, and disputes arise.

14.1 hrs

wasted per week

Searching for info, conflict resolution

5%

Typical rework share

Direct costs due to errors

€37.9M

Avg. dispute value

Taking 14.2 months to resolve

Sources: FMI Corp, PlanGrid, Navigant Construction Forum

Workflow

How the weekly report is created

1. Walkthrough

Easily with a smartphone or a 360° camera. No training necessary.

1
2

2. 3D Model

We create a photorealistic 3D model with a timestamp. Walkable in the browser.

3. Results

You automatically receive the weekly report and the list of open items.

3

One link for the whole team

3D model in the browser

Runs on any laptop. No installation. Access for owners, general contractors, and subcontractors.

Time comparison & evidence

Jump back week by week. Prove the construction status at any point in time.

Automatic reports

Progress, open items, and deviations are recognized and listed by the AI.

Visual Proof

Time comparison & evidence

Drag the slider to compare two construction phases of the same area.

After closing the walls
MEP installation phase
MEP installation phase
After closing the walls
OFFER

Test run (4 weeks)

  • 1 construction site in Munich or surroundings
  • 1 walkthrough per week
  • Every week: report + open items

Effort for you: one contact person, 10 minutes per week.

Preview

Weekly Construction Progress Report (Example)

This is what the result looks like that you and your partners receive automatically every week.

Open full screen A4 report

Project: Residence by the Park

Reporting period: CW 07 (09.02.2026 - 15.02.2026)

Updated 2 hrs ago
Status: On track
Construction report preview
View: 2nd floor

Weather

12°C, Sunny

Personnel

12 workers on site

Progress this week

  • Screed work on the ground floor 100% completed
  • Installation of interior doors (south wing) started
  • Electrical fine installation (2nd floor) completed

Open items

Defect window

Scratch on the window frame

Room 204

AI find: Damage to the powder coating on the frame profile.

Defect sealant

Missing sealant

Bathroom 102

Sanitary area (north wall): Sealing collar in the shower area is missing.

Data and Security

Access Control

Invite-only access

Your Property

Data remains yours, deletion at any time

EU Hosting

Storage in the EU upon request

Confidential

NDA possible at any time

Shall we test this on a construction site
in Munich?